The shipments will be hand unloaded or by using forklift.
Full PPE as per risk assessment and site safety plan and proceduresĬable tray and related materials will be shipped via an enclosed van, trailer, or flatbed trailer.Working Platforms: Scaffolding as required within the specific work area.Below is list of necessary plant and equipment for this electrical work method.